Rubber Removal

Project Owner: USACE POCA
Contract: W912PL-14-D-0036-0005
Project Location: Edwards AFB
Contract Award: Direct Award 8(a)
Scope of Work: Removed rubber on touchdown area a concrete surface totaling 400,000 SF and repainted affected area as required. Removed rubber on a second touchdown area concrete surface totaling 800,000 SF and repaint affected area as required. All work was conducted at night while runway closed